The Serbian subsidiary of Italian Fintel Energia Group is planning to build a new wind farm that would be the largest onshore facility of its kind in Europe. To be located in northern Serbia, it’s designed to have an installed capacity of 572 MW. Fintel plans to build two more 10 MW wind farms in the same region. The company will carry out the project through its SPVs Maestrale Ring, Lipar and Lipar 2. The project would increase the total installed wind power capacity in Serbia from 352 MW to 944 MW.